2026 Front Street & US Hwy 2 Improvements
Short-term Front Street Repairs are required due to multiple trip hazards and the general poor condition of the existing streetscape. Public Works is working to

Commercial Street Wastewater Collection System Improvements
The City will be upgrading and re-aligning wastewater flows along Commercial Street between 3rd Street and 8th Street. The project generally consists of construction of

2026 Water Main Connections & Upgrades
The City is upgrading aging water mains serving residential areas to improve reliability and water system performance. The project includes the installation of approximately 1,500

Downtown Parking Garage
The goal of this project is to add a minimum of 200 covered parking stalls within a short walking distance to Front Street Park in

Upper Valley Community Center
During the October 28, 2025, City Council Study Session, City Administrator Selby provided an update to City Council regarding the Osborn property. A brief history

2026 Parking Lot Improvements
The Freund, Enchantments, Dragontail, Blewett, and Parking Office parking lots are getting a facelift. Each lot will undergo various levels of construction to improve their

Blackbird Island Shore Restoration
This project entails completing shoreline restoration at the footing of the pedestrian bridge crossing to Blackbird Island. The existing bank on the island side of

Safe Streets and Roads for All (SS4A)
A Safe Streets and Roads for All (SS4A) Safety Action Plan is a community-based plan to make streets safer for everyone. It looks at where

Front Street Pedestrian Plaza
This project began with Psomas in September 2024 and is focused on developing a comprehensive 10% Design Report to serve as the basis for the

Mountain View Cemetery Expansion
The City owns and operates the Mountain View Cemetery, located at 12874 Cemetery Road. Currently, there is a very limited number of burial plots available

Ski Hill Drive Phase 2
Currently, Ski Hill Drive has very limited pedestrian facilities. As a major collector, Ski Hill Drive experiences a proportionately large volume of the City’s traffic.

Pine Street Phase 2: Titus Road to Chumstick Highway
In March 2022, the City was awarded Surface Transportation Block Grant (STBG) federal funding to complete a preliminary design study for the Pine Street Phase
NOTE: This page is a live document, and will be a continual work in progress. We have more projects on our radar that will be added as staff time allows and project dates approach. Each project has information specific to that project, as well as contact info for questions and FAQs, which will be updated on a regular basis if questions arise.